2000 kWp Turnkey Solar EPC 2500 kWh Liquid-Cooled BESS Lahore • LESCO Grid Payback: 1.85 Years

2000 kWp Solar EPC & 2500 kWh BESS for Steel Mills in Lahore (LESCO)

Complete turnkey engineering feasibility for Steel Re-Rolling & Arc Furnace Works operating across Sundar Industrial Estate, Quaid-e-Azam Industrial Estate (Kot Lakhpat), Multan Road, Raiwind, Kahna Kacha. Designed to eliminate daytime grid consumption, eradicate LESCO peak-hour penalty charges (5:00 PM – 10:00 PM), and stabilize critical power quality.

Annual Clean Generation 3060,000 kWh Specific Yield 1,530 kWh/kWp
Projected Annual Savings PKR 208.5M Direct Recurrent Cashflow
Turnkey EPC CAPEX PKR 386.0M Panels, BESS & Net-Metering
Simple Capital Payback 1.85 Years IRR > 35% Equity Return
2000 kWp Solar EPC & 2500 kWh BESS for Steel Mills in Lahore (LESCO)
Industrial Archetype Reference

Steel Re-Rolling & Arc Furnace Works • Lahore

Engineered with 3120x 640W N-Type TOPCon bifacial modules (4.0x 40HC containers) across 160,000 sq ft of roof area.

Operational Context

Power Dynamics for Steel Mills in Lahore

Current Grid Infrastructure & Tariff Impact:

Huge Maximum Demand Indicator (MDI) penalties and high-voltage grid tariff surcharges undermine per-ton steel margins.

Operating under LESCO industrial tariff regulations, the current blended rate exceeds PKR 64.0/kWh after accounting for base tariffs, Fuel Price Adjustments (FPA), Financing Cost Surcharges (FC-SUR), and regional electricity duties.

Grid Feeder Voltage: 11kV Dedicated / Independent Industrial Feeders
Regional Solar Irradiance: 4.2 Peak Sun Hours / Day
Grid Quality Factor: Frequent feeder maintenance shutdowns and strict peak-hour penalty enforcement

The Fusion AI Solar Engineered Solution:

By deploying a customized 2000 kWp Solar Array coupled with 2500 kWh of Liquid-Cooled LiFePO4 BESS Storage, the facility achieves complete daytime self-reliance.

  • Induction furnace surge smoothing and MDI peak demand shaving
  • High-tensile heavy-gauge structural clips rated for heavy mechanical vibration and 160 km/h wind loads
  • Automated LESCO / LESCO reverse power zero-export control
  • Cloud dispatch telemetry via Hermes AI OS
Engineering Specifications

Turnkey Equipment Bill of Quantities (BOQ)

Subsystem Specification & Manufacturer Standard Quantity / Rating Warranty
PV Modules Tier-1 N-Type TOPCon Dual-Glass Bifacial (585W–725W, 22.5%+ Efficiency) 3120 Units (4.0x 40HC Container) 12-Yr Product / 30-Yr Linear
Inverters 16x 125 kW String Inverters + 2.5 MVA 0.8kV/11kV Oil-Immersed Step-Up Transformer with Smart String I-V Curve Diagnosis High-Voltage 1100V Decentralized 5-Yr Standard / 10-Yr Extended
BESS Storage 1x 2.5 MWh 40ft Containerized LiFePO4 Energy Storage Block with Central PCS (6,000 Cycles @ 90% DoD, Liquid Chiller Differential ≤ 2.5°C) 2500 kWh Capacity 10-Yr Operational Warranty
Mounting Structure High-tensile heavy-gauge structural clips rated for heavy mechanical vibration and 160 km/h wind loads (Wind Rating 150 km/h) 160,000 sq ft Area 25-Yr Anti-Corrosion
BOS & Protection Copper DC cables (XLPO 1.5kV), motorized DC disconnects, Type II SPD, 11kV HT metering unit Complete Turnkey Package 1-Yr EPC O&M Comprehensive
Frequently Asked Questions

Engineering & DISCO Compliance FAQs

Q. What is the estimated payback period for a 2000 kWp solar plant at Steel Mills in Lahore?

Based on 2026 LESCO tariffs (~PKR 64.0/kWh blended and PKR 78.20/kWh peak rate), the simple capital payback period is estimated at 1.85 years. Annual operational electricity savings reach approximately PKR 208.5 Million.

Q. How does the 2500 kWh LiFePO4 BESS eliminate LESCO peak charges?

The containerized liquid-cooled battery system charges during midday solar peak hours at a levelized cost of ~PKR 9.50/kWh, and automatically discharges during the mandatory LESCO 5:00 PM – 10:00 PM peak window, completely neutralizing grid peak penalty tariffs.

Q. How is roof leakage prevented on Steel Re-Rolling & Arc Furnace Works Heavy Steel Truss & Corrugated Metal Sheeting?

We utilize High-tensile heavy-gauge structural clips rated for heavy mechanical vibration and 160 km/h wind loads, which preserves structural manufacturer warranties and eliminates water seepage risks while resisting 150 km/h wind uplift.

Q. Does Fusion AI Solar handle LESCO net-metering approvals in Lahore?

Yes. Fusion AI Solar provides complete turnkey engineering and regulatory management, including Distribution Transformer load clearance, NEPRA generation license application, reverse power relay commissioning, and green two-way bi-directional meter activation.