Fusion AI Solar Logo
FUSION AI SOLAR

Industrial Clean Energy EPC • BESS

Home / Solar Solutions / Sheikhupura & Muridke / Flour & Ghee Mills
1000 kWp Turnkey Solar EPC 1200 kWh Liquid-Cooled BESS Sheikhupura & Muridke • LESCO Grid Payback: 1.85 Years

1000 kWp Solar EPC & 1200 kWh BESS for Flour & Ghee Mills in Sheikhupura & Muridke (LESCO)

Complete turnkey engineering feasibility for Flour, Oil & Ghee Processing Mills operating across Lahore-Sheikhupura Road, Muridke-Narowal Belt, Qila Sattar Shah Industrial Cluster. Designed to eliminate daytime grid consumption, eradicate LESCO peak-hour penalty charges (5:00 PM – 10:00 PM), and stabilize critical power quality.

Annual Clean Generation 1530,000 kWh Specific Yield 1,530 kWh/kWp
Projected Annual Savings PKR 102.4M Direct Recurrent Cashflow
Turnkey EPC CAPEX PKR 189.6M Panels, BESS & Net-Metering
Simple Capital Payback 1.85 Years IRR > 35% Equity Return
1000 kWp Solar EPC & 1200 kWh BESS for Flour & Ghee Mills in Sheikhupura & Muridke (LESCO)
Industrial Archetype Reference

Flour, Oil & Ghee Processing Mills • Sheikhupura & Muridke

Engineered with 1560x 640W N-Type TOPCon bifacial modules (2.0x 40HC containers) across 80,000 sq ft of roof area.

Operational Context

Power Dynamics for Flour & Ghee Mills in Sheikhupura & Muridke

Current Grid Infrastructure & Tariff Impact:

Rising blended industrial tariffs (PKR 64/kWh) erode commodity food staple processing profitability.

Operating under LESCO industrial tariff regulations, the current blended rate exceeds PKR 64.0/kWh after accounting for base tariffs, Fuel Price Adjustments (FPA), Financing Cost Surcharges (FC-SUR), and regional electricity duties.

Grid Feeder Voltage: 11kV Dedicated Industrial Overhead Lines
Regional Solar Irradiance: 4.2 Peak Sun Hours / Day
Grid Quality Factor: Heavy continuous process industries facing unscheduled load management

The Fusion AI Solar Engineered Solution:

By deploying a customized 1000 kWp Solar Array coupled with 1200 kWh of Liquid-Cooled LiFePO4 BESS Storage, the facility achieves complete daytime self-reliance.

  • Continuous roller grinding without grid stoppage and peak tariff offset
  • Sealed dust-proof ballast and clamp mounting conforming to food hygiene guidelines
  • Automated LESCO / LESCO reverse power zero-export control
  • Cloud dispatch telemetry via Hermes AI OS
Engineering Specifications

Turnkey Equipment Bill of Quantities (BOQ)

Subsystem Specification & Manufacturer Standard Quantity / Rating Warranty
PV Modules Tier-1 N-Type TOPCon Dual-Glass Bifacial (585W–725W, 22.5%+ Efficiency) 1560 Units (2.0x 40HC Container) 12-Yr Product / 30-Yr Linear
Inverters 8x 125 kW Sungrow / Huawei SUN2000-115KTL with Smart String Monitoring with Smart String I-V Curve Diagnosis High-Voltage 1100V Decentralized 5-Yr Standard / 10-Yr Extended
BESS Storage 1x 1.2 MWh 20ft ISO High-Cube Liquid-Cooled BESS Container (CATL LFP Cells) (6,000 Cycles @ 90% DoD, Liquid Chiller Differential ≤ 2.5°C) 1200 kWh Capacity 10-Yr Operational Warranty
Mounting Structure Sealed dust-proof ballast and clamp mounting conforming to food hygiene guidelines (Wind Rating 150 km/h) 80,000 sq ft Area 25-Yr Anti-Corrosion
BOS & Protection Copper DC cables (XLPO 1.5kV), motorized DC disconnects, Type II SPD, 11kV HT metering unit Complete Turnkey Package 1-Yr EPC O&M Comprehensive
Frequently Asked Questions

Engineering & DISCO Compliance FAQs

Q. What is the estimated payback period for a 1000 kWp solar plant at Flour & Ghee Mills in Sheikhupura & Muridke?

Based on 2026 LESCO tariffs (~PKR 64.0/kWh blended and PKR 78.20/kWh peak rate), the simple capital payback period is estimated at 1.85 years. Annual operational electricity savings reach approximately PKR 102.4 Million.

Q. How does the 1200 kWh LiFePO4 BESS eliminate LESCO peak charges?

The containerized liquid-cooled battery system charges during midday solar peak hours at a levelized cost of ~PKR 9.50/kWh, and automatically discharges during the mandatory LESCO 5:00 PM – 10:00 PM peak window, completely neutralizing grid peak penalty tariffs.

Q. How is roof leakage prevented on Flour, Oil & Ghee Processing Mills Concrete Slab & Metal Shed Hybrid Roofs?

We utilize Sealed dust-proof ballast and clamp mounting conforming to food hygiene guidelines, which preserves structural manufacturer warranties and eliminates water seepage risks while resisting 150 km/h wind uplift.

Q. Does Fusion AI Solar handle LESCO net-metering approvals in Sheikhupura & Muridke?

Yes. Fusion AI Solar provides complete turnkey engineering and regulatory management, including Distribution Transformer load clearance, NEPRA generation license application, reverse power relay commissioning, and green two-way bi-directional meter activation.

Ready for Site Survey?

Deploy 1000 kWp Solar for Flour & Ghee Mills in Sheikhupura & Muridke

Connect directly with our Chief Solar Architect and CEO on WhatsApp. We provide full bill analysis and structural survey within 48 hours.

Request Official Proposal on WhatsApp