Granular Electrical & Mechanical Matrix
| Continuous Power Rating | 1000 kVA (Solar Step-Up) | Primary Low-Voltage Input | 0.4 kV / 0.8 kV Inverter AC Output |
| Secondary Step-Up Output | 11 kV ± 2×2.5% Grid Interconnection | Vector Group Connection | Dyn11 or Dy11y11 Dual-Secondary |
| Winding Conductor Material | Oxygen-Free Copper Conductors with Nomex Insulation | Cooling Classification | ONAN (Oil Natural Air Natural) with Corrugated Radiators |
| Insulating Fluid Specification | Inhibited Mineral Transformer Oil conforming to IEC 60296 | Auxiliary Protection | Double-Float Buchholz Relay, Pressure Relief Valve with Microswitch, Oil & Winding Temp Indicators |
| Utility Conformance | IEC 60076, WAPDA P-46, NEPRA Grid Code Interconnection Compliant | Total Assembled Weight | 4200 kg (Total with Oil) |
2026 Pakistan Tariff Eradication & Net-Metering
With blended industrial electricity tariffs hovering at PKR 64.0/kWh and mandatory peak tariffs climbing to PKR 78.20/kWh, this equipment guarantees rapid capital recapture. It is pre-certified for seamless integration with LESCO, FESCO, GEPCO, K-Electric, MEPCO, and IESCO distribution substations, featuring built-in reverse power relays and bi-directional meter synchronizers.
- Eliminates daytime Peak Load Penalties and Maximum Demand Indicator (MDI) spikes.
- Built-in smart IV curve diagnostic telemetry detects soiling or string anomalies instantly.
- Sub-millisecond microgrid ride-through shields sensitive CNC, cleanrooms, and spinning frames.
Verified Corporate Client Reviews
Engr. Tariq Mehmood Verified Buyer
Chief Electrical Engineer • Crescent Textile Mills Ltd (Faisalabad)
"We deployed this equipment across our 1.8 MW spinning shed in Khurrianwala. In the extreme 46°C summer heat of Punjab, the actual power output and thermal derating stayed strictly within 0.28%/°C, significantly outperforming our legacy Tier-1 arrays. Synchronization with the FESCO 11kV dedicated feeder was immediate, and the zero-export limiter functioned perfectly during transformer maintenance. Over the last 6 months, our monthly blended power cost dropped by PKR 3.8 Million. Build quality, junction box sealing, and framing rigidity are exemplary."
Malik Usman Javed Verified Buyer
Managing Director • Farooq Chemical Industries (Kot Lakhpat, Lahore)
"As a chemical plant running 24/7 continuous reaction kettles, voltage sags and LESCO peak hour surcharges (PKR 78.20/kWh) were destroying our profit margins. Integrating this setup with our liquid-cooled LiFePO4 battery system completely wiped out our peak grid draw from 5:00 PM to 10:00 PM. The capital payback timeline is currently tracking at 1.82 years, roughly 3 months faster than Fusion AI Solar's initial proposal. The engineering team dispatched complete PEB load analysis drawings and managed the entire green meter commissioning."
Zohaib Hassan Verified Buyer
Head of Engineering & Cold Chain Operations • Apex Refrigerated Logistics Hub (Multan / MEPCO)
"Cold storage facilities live and die by compressor uptime. Running diesel generators during daytime feeder tripping was costing us upwards of PKR 130 per kWh. Since commissioning this system with non-penetrating Klip-Lok clamps on our PIR sandwich panels, our refrigeration plant runs 100% on clean solar generation during daytime hours. Inverter harmonic distortion is negligible (THD under 1.8%), protecting our sensitive Variable Frequency Drives. Exceptional reliability and verified Tier-1 grade materials."
Complementary Balance-of-System Equipment
Canadian Solar BiHiKu7 N-Type TOPCon Dual-Glass Bifacial 580W Tier-1 Solar PV Module
Canadian Solar HiKu7 Mono-Facial High-Power Module 585W Tier-1 Solar PV Module
Jinko Solar Tiger Neo N-Type TOPCon Dual Glass 590W Tier-1 Solar PV Module
Need Transfopower High-Yield Solar Inverter Duty Step-Up Transformer Deployed at Your Facility?
Fusion AI Solar engineers handle electrical design, structural PEB load calculations, DISCO grid approvals, and commissioning anywhere across Pakistan.