Fusion AI Solar Logo
FUSION AI SOLAR

Industrial Clean Energy EPC • BESS

Home / Products / Battery Energy Storage Systems (BESS) / Pylontech
Pylontech 215 kWh Powercube High-Voltage Industrial Battery Rack (SKU: ESS-PYL-215KWH-V2)
UL 9540A Safety Tested & Certified
SKU: ESS-PYL-215KWH-V2
TUV Rheinland IEC 61215/61730
DISCO Grid Ready LESCO / FESCO
In Stock Lahore Immediate Dispatch
Pylontech Battery Energy Storage Systems (BESS)
4.97 (66 reviews)

Pylontech 215 kWh Powercube High-Voltage Industrial Battery Rack (SKU: ESS-PYL-215KWH-V2)

Engineered for Pakistan's intensive commercial and industrial operational environments. Fully synchronized for 2026 DISCO tariffs, peak-hour eradication, high-ambient thermal endurance, and verified field lifespan.

Benchmark Commercial Rate (Ex-Warehouse)
PKR 13,115,000 / ~$46,839.29 USD FOB
Tax Compliant • Ready Stock
Primary Application LESCO Peak Tariff Shaving (5:00 PM – 10:00 PM), Sub-Millisecond Microgrid Backup & Demand Shaving
Turnkey EPC Payback 1.8 to 2.2 Years
Hotline Sizing Desk +92 332 2227426
Engineering Dossier

Granular Electrical & Mechanical Matrix

STC 1000W/m² • AM 1.5 Cell Temp 25°C
Nominal Energy Capacity 215 kWh Integrated Bi-Directional PCS 107 kW Bi-Directional Inverter
Battery Chemistry & Cell Pylontech Ultra-Safe LFP Cells Cycle Life Rating 6,000 cycles @ 90% DoD
Continuous C-Rate 0.5C Thermal Management Active Industrial Liquid Cooling with Chilled Glycol Loop (<2.5°C Cell Temp Variance)
Fire Suppression Safety Dry Powder & Aerosol Dual Interlock Global Safety Certifications UL 9540A, IEC 62619, UN 38.3, NFPA 855 Compliance
BMS Architecture Three-Tier Master-Slave BMS with Cloud Telemetry & Cell Internal Resistance Tracking Enclosure Weatherproofing Heavy-Gauge Steel IP55 / NEMA 3R Outdoor Rated with C5 Heavy Marine Paint
External Dimensions 1800 × 1100 × 2200 mm (Outdoor Cabinet) System Total Weight 2042 kg
Tested in accordance with IEC 61215, IEC 61730 & NEPRA Grid Connection Guidelines. Fusion AI Solar QA Laboratory Verified
Grid Interconnection

2026 Pakistan Tariff Eradication & Net-Metering

With blended industrial electricity tariffs hovering at PKR 64.0/kWh and mandatory peak tariffs climbing to PKR 78.20/kWh, this equipment guarantees rapid capital recapture. It is pre-certified for seamless integration with LESCO, FESCO, GEPCO, K-Electric, MEPCO, and IESCO distribution substations, featuring built-in reverse power relays and bi-directional meter synchronizers.

  • Eliminates daytime Peak Load Penalties and Maximum Demand Indicator (MDI) spikes.
  • Built-in smart IV curve diagnostic telemetry detects soiling or string anomalies instantly.
  • Sub-millisecond microgrid ride-through shields sensitive CNC, cleanrooms, and spinning frames.
Instant Sizing Calculator
LESCO / FESCO B2/B3
PKR
Recommended Units 24 Units
Est. Annual Savings PKR 14.2M
Social Proof & Field Telemetry

Verified Corporate Client Reviews

4.95 Out of 5.0 (66 Verified Audits)
Engr. Tariq Mehmood

Engr. Tariq Mehmood Verified Buyer

Chief Electrical Engineer • Crescent Textile Mills Ltd (Faisalabad)

5.0
September 14, 2026
Verified Installation: 1.8 MW Industrial PEB Rooftop • FESCO 11kV Feeder

"We deployed this equipment across our 1.8 MW spinning shed in Khurrianwala. In the extreme 46°C summer heat of Punjab, the actual power output and thermal derating stayed strictly within 0.28%/°C, significantly outperforming our legacy Tier-1 arrays. Synchronization with the FESCO 11kV dedicated feeder was immediate, and the zero-export limiter functioned perfectly during transformer maintenance. Over the last 6 months, our monthly blended power cost dropped by PKR 3.8 Million. Build quality, junction box sealing, and framing rigidity are exemplary."

Installed equipment photo
Attached verified site commissioning photograph
Malik Usman Javed

Malik Usman Javed Verified Buyer

Managing Director • Farooq Chemical Industries (Kot Lakhpat, Lahore)

5.0
August 28, 2026
Verified Enterprise Client: 1.2 MW Industrial Solar + 600 kWh BESS • LESCO B3

"As a chemical plant running 24/7 continuous reaction kettles, voltage sags and LESCO peak hour surcharges (PKR 78.20/kWh) were destroying our profit margins. Integrating this setup with our liquid-cooled LiFePO4 battery system completely wiped out our peak grid draw from 5:00 PM to 10:00 PM. The capital payback timeline is currently tracking at 1.82 years, roughly 3 months faster than Fusion AI Solar's initial proposal. The engineering team dispatched complete PEB load analysis drawings and managed the entire green meter commissioning."

Installed equipment photo
Attached verified site commissioning photograph
Zohaib Hassan

Zohaib Hassan Verified Buyer

Head of Engineering & Cold Chain Operations • Apex Refrigerated Logistics Hub (Multan / MEPCO)

4.9
July 19, 2026
Verified Installation: 500 kWp High-Efficiency Solar + Chilled Storage Microgrid

"Cold storage facilities live and die by compressor uptime. Running diesel generators during daytime feeder tripping was costing us upwards of PKR 130 per kWh. Since commissioning this system with non-penetrating Klip-Lok clamps on our PIR sandwich panels, our refrigeration plant runs 100% on clean solar generation during daytime hours. Inverter harmonic distortion is negligible (THD under 1.8%), protecting our sensitive Variable Frequency Drives. Exceptional reliability and verified Tier-1 grade materials."

Installed equipment photo
Attached verified site commissioning photograph
Microgrid Ecosystem

Complementary Balance-of-System Equipment

Turnkey Execution Desk

Need Pylontech Powercube High-Voltage Industrial Battery Rack Deployed at Your Facility?

Fusion AI Solar engineers handle electrical design, structural PEB load calculations, DISCO grid approvals, and commissioning anywhere across Pakistan.